Here are a few shots of the plywood fitted into the cockpit area. The pieces will need to come out again to be coated on the backside with epoxy to seal it up. There are 2 hoses exiting the stern of the boat. These are for one manual bilge pump located in the cockpit as well as the electric bilge pump which is located in the cabin. Under the plywood there is also the electrical for the shore power, solar panels, auto pilot, and Stern light. Before the final piece of the cockpit is fitted the skeg support bolts will come through the bottom of the boat and will have to be bolted up right at the end.
Here is a link to my YouTube channel.
https://youtu.be/oI0kZE8mGcI
Comments